We have developed a process to be used in underground mining that allows the mine to create a void prior to production mining without the need to drill and blast the void. We want an animation of the process that may run 3 to 5 minutes that can show easily how the process is carried out. The animation will need to show the components of the system, how they are assembled underground, how they are installed and the mining process. Attached are some 2D sketch's and a more detailed explanation of the process.
There is also a picture of the type of pipe that is to be used (without the flange strap welded in the pipe) there are 2 CAD drawings that provide the details of the flange (which is made up from 3 pieces) that is welded into each end of the poly pipe. The flange has holes for the poly rope to be inserted through when the unit is assembled underground.