power world task emergency help

Закрито Опубліковано %project.relative_time Оплачується при отриманні
Закрито Оплачується при отриманні

Making a Power System Reliable

Objectives:

To understand the planning/design process that goes into making a power system reliable.

Tasks and Report:

1. To test the reliability of a system we will apply the following rule:

No single line or generator outage will leave the system with lines overloaded or bus voltages violating limits.

2. Given the PowerWorld case [login to view URL] with the drawing file

[login to view URL]

a. Read the case into PowerWorld and start it running

b. Open each line (open a line by clicking on one breaker at the line’s end) one at a time and observe the loading on all other lines. If another line is operating at or above 95% of its limits that outage is considered to have caused the system to fail. Similarly, if an open line causes any bus voltages to go outside the range 0.95 pu to 1.05 pu that case will also be considered to have caused the system to fail.

c. Drop each generator one at a time (again just open the generator’s breaker). PowerWorld will reallocate the lost generation to other generators. Again, any lines that are overloaded beyond 85% or buses which have a voltage outside the 0.95-1.05 limits will be considered to have caused the system to fail.

3. As a power system engineer you are going to make this system reliable. To do this you can add new equipment such as new transmission lines, new generators, capacitors on buses, etc. You will need to stop the simulator and put it into edit mode and then use the drawing tools and the information tools that can set the parameters for each new component added. If you add a transmission line that is in parallel with an existing line give the new line the same parameters as the existing line. If you add a generator, limit its capacity to 200 MW.

4. Add as many lines, generators, capacitors, etc as necessary so that at the end of the process you can run the tests above in 2b and 2c and no system failures are seen. Try to achieve this with as few new components added as necessary.

Електротехніка Електроніка Техніка Технологія машинобудування Схемотехніка

ID Проекту: #20415829

Про проект

7 заявок(-ки) Дистанційний проект Остання активність 4 роки(ів) тому

7 фрілансерів(-и) готові виконати цю роботу у середньому за €175

bchandra1955

Professional engineer with 40 years of experience in design and development Relevant Skills and Experience Please attach full requirements and details

€200 EUR за 10 дні(-в)
(107 відгуків(и))
6.4
noumanalishakir

Hi I am interested in your project. Please let me know about the your availability. What is your time limits for this project.? Regards Engineer Nouman

€555 EUR за 30 дні(-в)
(33 відгуків(и))
5.4
SidraSadaqat

Hey, I can handle your power world task emergency as I have done Masters in Engineering so it’s completely doable for me. Relevant Skills and Experience Please message me so we can discuss. Thanks Sidra

€24 EUR за 1 день
(4 відгуків(и))
3.7
Enganas1989

Expert in Power System. Relevant Skills and Experience Expert Power Engineer.

€150 EUR за 3 дні(-в)
(8 відгуків(и))
3.4
JacksonKarl

Hello, there. I have just read your project and I felt happy to see it. I have experienced for +5 years in this field and Particularly I have ever made it as you want. I am ready for your invitation. If you hire me, I Більше

€90 EUR за 2 дні(-в)
(0 відгуків(и))
0.0
anish786007

Hello, I'm Anish Tarajiya and I've completed BE in mechanical. I can help you with your work. If you want to hire me then please contact me.

€55 EUR за 5 дні(-в)
(0 відгуків(и))
0.0